Author Archives: AdrianM

Resin, Resin Everywhere!

Not much to say today except I got a couple of layers of gelcoat and CSM laid up on the buck for the  side pod ducts, as you can see the under-layer of gel is orange, and (as you can’t … Continue reading

Posted in Winter 2009 Rebuild | Tagged , | Leave a comment

Yet More Mouldings

Many hours today again spent breathing styrene… which I have to say I rather like. :-) Firstly we made another floor in the right hand side mould. This time, instead of using ply as the longitudinal stiffeners we hadded two extra … Continue reading

Posted in Winter 2009 Rebuild | Tagged , , , | Leave a comment

New Floor Mk1

So having made a mould, it was time to make a floor.  The plan was gelcoat,tissue, 1 layer of chopped strand mat, reinforcing strips of 6mm ply, and then a final layer of woven rovings. All laid up with polyester … Continue reading

Posted in Winter 2009 Rebuild | Tagged , | Leave a comment

Not So Rolling Road+ Keeping the rain off.

The car spent last week on a little holiday at Power-tec to get rolling roaded. A scheduling mix up meant that they weren’t expecting me, but they could fit me in if I left the car with them – Top … Continue reading

Posted in General Race Stuff | Tagged , | Leave a comment

Nice to be behind the Wheel Again

Nice to be behind the wheel again! After the snow and ice and general tribulations over getting the car ready…. or at least all one uniform colour and ready, I can report that we had a very successful day. and … Continue reading

Posted in Snetterton, Testing | Tagged , , , | Leave a comment

The Big Tidy + Extra Cooling

This saturday Dunc and I spent half the day clearing the garage of 1000 variable types of sh*… erm rubbish. Duncan felt that the occasion of my work bench being clear occurred so infrequently that it deserved recording for posterity. … Continue reading

Posted in Winter 2008 Rebuild | Tagged , , , , , | Leave a comment

Avoiding the Cowpats!

If I may quote Edmund Blackadder “The path of my life is strewn with cow pats from the Devils’s own satanic herd!”. Well the path of this respray seems to have been long and arduous and indeed strewn waist deep … Continue reading

Posted in Winter 2008 Rebuild | Tagged | Leave a comment

Rapidly Running out of Time :-(

Well we are now only 6 days or so away from the first outing at Snetterton and the liberal “flump” of snow delivered to Eastern England has really screwed my timetable up. At some times this week I couldn’t even … Continue reading

Posted in Winter 2008 Rebuild | Tagged | Leave a comment